Sunday 5 August 2012

bathroom progress

bathroom in hallway!
We arrived home from a short break away with a small glimmer of hope brewing that perhaps our bathroom will be ready for us when we got back. Instead we were greeted by the bathroom in the hallway!
getting there
 A few days later however the tiler did arrive and this is now the state of play. Getting there. Apparently the plumber won't be back to finish things off for another couple of weeks. It's tantalisingly close to being finished and us having a clean, sleek bathroom to call our own. I can't wait for my first bath in here:)

The design has changed a bit and I didn't get my dookits but overall I'm happy with the end result. We do however have a big pile of the black tiles either broken or covered in adhesive that the tiler refused to work with. At £5 a tile we really do need to find some sort of use for them.
new tiles  
I now need to get a mirror and blinds. The tiles are porcelain so we require a special drill bit to put up the mirror. It costs £200 for the bit so hoping our plumber has one in his tool kit.

No comments:

Post a Comment